Morgan's Striping Service, Inc.
Noblesville, IN 46060
Office: 317-776-2116
Fax:     317-776-2049
E-mail:
mms@morganstriping.com
Before                                                 After
Crack Sealing


  •  Should be the first preventative Maintenance tool utilized

  • Repairs the effects of sun and moisture, as well as the freeze/thaw cycle that contributes to Asphalt Cracking

  • One of the most cost effective strategies for extending pavement service life

  • Cracks in asphalt allow water under the pavement which causes the base to become unstable during the freeze            
    thaw cycle

  • Unstable base leads to more cracking and eventual pavement failure.

  • Cracks which form intersections are a pothole waiting to happen.

  • Minimizes intrusion of surface water.

  • Reduces the formation of future cracks.


   Crack filling is a vital key in the maintenance of your parking lot. Cracks are a direct path for water to seep in and
undermine the compaction of the pavement. Hot crack fillings 1/4" and wider will keep the cracks from continuing to
expand and prevent additional ones from forming. The rubberized hot asphaltic material that we use is of the industries
highest standard and conforms to ASTM D6690 specifications as shown here
http://www.crafco.com/PDF%20Files/News_Library/Articles/HMAT_Crack%20Sealing_April%202005.pdf

    It is extremely important to repair any cracks that arise and maintain an ongoing Asphalt Crack Repair maintenance
program. Once water is allowed to enter the foundation, the foundation will begin to erode resulting in extensive and costly
damage. Asphalt Crack Repair is a fast and easy process with little inconvenience if you have the right equipment and
products to get the job done properly.